My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-09-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 09-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 12:04:04 PM
Creation date
9/5/2014 3:18:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option: Removal of existing pit and replacement. <br />Removal of pit. $4,530.00 <br />Replace pit. $2,750.00 <br />Total pit replacement $7,280.00 <br />Total project cost ( +Lift Pricing) $25,780.00 <br />Authorized Lube Tech ESI Signature <br />a <br />Jim Israelson <br />• This proposal may be withdrawn if not accepted within 15 days. Additional work performed <br />outside of the scope of work and the description above will be subject to additional charges. <br />• All work to be performed during normal working hours. If requested to work overtime <br />and/or on weekends /holidays, additional charges may apply. <br />• Area to be free and clear of all obstructions; delays caused by others will be subject to <br />additional charges. <br />• Sales tax will be applied unless a Tax Exempt ST3 form is on file at Lube Tech ESI <br />*ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are <br />satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment <br />will be made as outlined above. <br />Signature J Title Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.