My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-09-2014
NewBrighton
>
Council
>
Packets
>
2014
>
CCP 09-09-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 12:04:04 PM
Creation date
9/5/2014 3:18:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Replacement Justification Form <br />Fund INon -Fleet <br />Current Asset Detail <br />Department I Public Works (shared) <br />Asset replace 2 post axle engaging truck hoist <br />Description <br />Date Acquire 1992 Purchase Price <br />Replacement Detail <br />d Year Rep.Year Proj. Rep. Cost Life Justification /Purpose /impacts /Consequences <br />2015 2014 $53,560 21 Replacement due to wear. This hoist is used on the large trucks.The old <br />hoist has only 1- position safety stop. Public Works researching ways to <br />cut costs on the installation, with their help on it. <br />2014 2014 $53,600 21 !Replacement due to wear. This hoist is used on the large trucks.The old <br />hoist has only 1- position safety stop. Public Works researching ways to <br />!cut costs on the installation, with their help on it. <br />I <br />I ! <br />a � <br />2013 2014 $52,000 21 ;Replacement due to wear. This hoist is used on the large trucks.The old <br />'hoist has only 1- position safety stop. Public Works researching ways to <br />cut costs on the installation, with their help on it. <br />I <br />2012 20131, $46,300 20iReplacement due to wear. This hoist is used on the large trucks.The old <br />'hoist has only 1- position safety stop. <br />2011 2013 $44,900 20 <br />I 26 Assetl D 977 Cityl D <br />
The URL can be used to link to this page
Your browser does not support the video tag.