My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC Packet 06-19-2012
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
PC Packets
>
2012
>
PC Packet 06-19-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 8:22:54 AM
Creation date
10/14/2014 10:16:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
city(I <br /> VFW <br /> BRIGH ON <br /> 1he city Mal works for you <br /> interoffice <br /> MEMORANDUM <br /> to: Janice Gundlach, City Planner <br /> from: Craig Schlichting, Civil Engineer II <br /> subject: 309 5th Avenue-Accustream <br /> date: June 13, 2012 <br /> The Engineering Department has reviewed the site plan for Accustream and we offer the following <br /> comments: <br /> Streets-Parking Lot <br /> 1. Portions of the existing curb and gutter and pavement along 5m Avenue will be removed and replaced <br /> with the driveway removal. The proposed curb should match the B-style existing curb. A curb cut <br /> permit will be required to insure that the removal and replacement are done according to City <br /> Standards. <br /> 2. The plans include removal of existing bituminous at the SE corner of the site for a storm sewer <br /> connection. The owner shall coordinate this work with the adjacent landowner to allow proper site <br /> access for the duration of the project. <br /> 3. The owner is confirming the necessity of an unused existing access extension at the NE corner of the <br /> site. Please provide written documentation from the adjacent landowner complying with your plans to <br /> not provide an access with the current design. Additional parking could be striped in this area if it is <br /> not maintained as an access. <br /> 4. A note shall be added to the plans indicating that the contractor must contact Mark Herrick in the <br /> Engineering Department at 651-638-2054 for inspection of all street and utility work within 5th Avenue <br /> NW. <br /> 5. The engineer shall verify the location of all small utilities prior to construction to avoid potential <br /> conflicts with the proposed excavation of the filtration basin. <br /> 6. A maintenance plan should be provided to the City for the proposed pervious parking and filtration <br /> basin. <br /> 7. The existing retaining wall will need to meet loading requirements per the City of New Brighton <br /> building official. <br /> 8. Soil borings may be required by the watershed, it is recommended that the borings include a <br /> pavement design based on the existing soils found. <br />
The URL can be used to link to this page
Your browser does not support the video tag.