My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC Packet 11-15-2011
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
PC Packets
>
2011
>
PC Packet 11-15-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 7:25:09 AM
Creation date
10/14/2014 11:10:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
= <br /> cil�y of <br /> I3RICI-UU\ <br /> the city t y that works for ,i ou <br /> INTEROFFICE <br /> MEMORANDUM <br /> To: Janice Gundlach, City Planner <br /> From: Jim Williamette, Building Official <br /> Subject: October Planning Commission Agenda <br /> Date: 10/6/2011 <br /> I offer the following comments with regard to the October Planning Commission <br /> Agenda. <br /> Hypro-Pentair Water: <br /> • Loading on the structure should be confirmed to be able to carry the load of <br /> sprinkler pipes. <br /> • The flame spread rating of the material will have to be submitted to determine <br /> that it meets building code requirements. <br /> : - - • •' :rew Pub: ► <br /> • There is an elec n . . - - d .e - i ing on the ground <br /> as it is designee - - - . .• an• •. _ - - •- -. damaged. <br /> • A `d - - ' - ectrical review will be required to ensure it mee s ••-. <br /> Thank you, <br /> Jim <br />
The URL can be used to link to this page
Your browser does not support the video tag.