My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC Packet 11-15-2011
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
PC Packets
>
2011
>
PC Packet 11-15-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 7:25:09 AM
Creation date
10/14/2014 11:10:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dtyol'eo`#,v. <br /> VFW <br /> BI-11 \ <br /> 11�r r'il t Mai ttLI'i.S kir tOil <br /> INTEROFFICE <br /> MEMORANDUM <br /> To: Janice Gundlach, City Planner <br /> From: Tony Paetznick, Deputy Director of Public Safety <br /> Subject: Hypro/Pentair Project <br /> Date: October 6, 2011 <br /> Given the past history of police calls for service at the property, the definition <br /> provided by the overhang structure would hopefully deter thefts of recyclable <br /> metals from outdoor storage containers by designating the area and its contents <br /> as part of the facility and not just unwanted garbage. <br /> From a fire protection standpoint, the installation of a dry sprinkler system in this <br /> covered area would be ideal, especially considering the flammability of the <br /> manufacturing byproducts stored in the recycling and refuse containers. <br /> C:\Users\jgundt\AppData\Local\Microsoft\Windows\Temporary Internet Files\OLKAD20\CDHypro doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.