Laserfiche WebLink
CITY OF COLUMBIA HEIGHTS, MN <br />PROPOSED FINAL QUANTITIES <br />2013 CONCRETE STREET REHABILITATION <br />PROJECT 1302 SAP 113- 050 -012 <br />State Aid <br />Item No. <br />No. <br />Item Description <br />I Unit <br />I Quantity <br />Unit <br />Price <br />I Amount <br />BASE BID <br />2021.501 <br />1 <br />Mobilization <br />Lump sum <br />1 <br />$25,000.00 <br />$25,000.00 <br />2104.501 <br />2 <br />Remove integral concrete curb and gutter <br />Lin. Ft. <br />215 <br />$10.00 <br />$2,150.00 <br />2104.509 <br />3 <br />Remove catch basin cone section <br />Each <br />1 <br />$500.00 <br />$500.00 <br />2104.523 <br />4 <br />Salvage manhole /catch basin casting <br />Each <br />78 <br />$75.00 <br />$5,850.00 <br />2104.618 <br />5 <br />Remove concrete street (Boxout) <br />Sq. Ft. <br />2,387 <br />$10.00 <br />$23,870.00 <br />2211.5011 <br />6 <br />Aggregate base class 5 <br />Ton <br />155 <br />$40.00 <br />$6,200.00 <br />2301.602 <br />7 <br />Drill and grout reinforcement bar, #13 (Epoxy Coated) <br />Each <br />332 <br />$10.00 <br />$3.320.00 <br />2302.603 <br />8 <br />Joint and crack repair (Type Al) <br />Lin. Ft. <br />24,546 <br />$2.50 <br />$61,365.00 <br />2302.603 <br />9 <br />Joint and crack repair (Type A2) <br />Lin. Ft. <br />- <br />$2.50 <br />$0.00 <br />2302.603 <br />10 <br />Joint and crack repair (Type B3) <br />1 Lin. Ft. <br />2,425 <br />$27.00 <br />$65,475.00 <br />2302.603 <br />11 <br />Full depth repair (Type CD -LV or CA -LV) <br />Lin. Ft. <br />2,049 <br />$60.00 <br />$122,940.00 <br />2302.6081 <br />12 <br />Supplemental reinforcement bars, #13 (Epoxy Coated) <br />Pound <br />107 <br />$2.00 <br />$214.00 <br />2302.6081 <br />13 <br />Supplemental reinforcement bars, #16 (Epoxy Coated) <br />Pound <br />2,303 <br />$2.00 <br />$4,606.00 <br />2302.6181 <br />14 <br />Pavement replacement (Type CX) <br />Sq. Ft. <br />11,410 <br />$16.00 <br />$182,560.00 <br />2302.618 <br />15 <br />Partial depth repair (Type BA) <br />Sq. Ft. <br />2,063 <br />$27.00 <br />$55.701.00 <br />2302.618 <br />16 <br />Partial depth repair special (Type BE) <br />Sq. Ft. <br />884 <br />$15.00 <br />$13,260.001 <br />2302.618 <br />17 <br />Spot full depth repair (Type C1 -LV) <br />Sq. Ft. <br />532 <br />$25.00 <br />$13,300.00 <br />2331.604 <br />18 <br />Bituminous patch special, 6" (Boxout) <br />Sq. Yd. <br />130 <br />$135.00 <br />$17,550.00 <br />2503.602 <br />19 <br />Install new sanitary MH casting with HDPE rings <br />Each <br />38 <br />$600.00 <br />$22,800.00 <br />2503.6021 <br />20 <br />Install sanitary MH external seal <br />Each <br />22 <br />$300.00 <br />$6,600.00 <br />2506.5021 <br />21 <br />Install new storm CB cone section <br />Each <br />1 <br />$2,250.00 <br />$2,250.00 <br />2506.521 <br />22 <br />Install new storm MH casting with HDPE rings <br />Each <br />4 <br />$600.00 <br />$2,400.00 <br />2506.521 <br />23 <br />Install new CB casting with HDPE rings <br />Each <br />32 <br />$900.00 <br />$28,800.00 <br />2506.521 <br />24 <br />Install new 2' by T CB casting with HDPE rings <br />Each <br />4 <br />$800.00 <br />$3,200.00 <br />2531.501 <br />25 <br />Integrant curb design S5 <br />Lin. Ft. <br />215 <br />$35.00 <br />$7,525.00 <br />2531.618 <br />26 <br />Concrete street (Boxout) <br />Sq. Ft. <br />1,217 <br />$15.00 <br />$18,255.00 <br />2563.601 <br />27 <br />Traffic control <br />Lump sum <br />1 <br />$6,900.00 <br />$6,900.00 <br />2573.530 <br />28 <br />Storm drain inlet protection <br />Each <br />36 <br />$100.00 <br />$3,600.00 <br />2575.505 <br />29 <br />Sod with topsoil, Type lawn <br />Sq. Yd. <br />230 <br />$50.00 <br />$11,500.00 <br />ALTERNATE 1 - LONGITUDINAL JOINTS <br />2302.6031 Joint and crack repair (Type Al) I Lin. Ft. 22,097 $2.50 $55,242.50 <br />CHANGE ORDER 1 <br />2104.601 <br />1 <br />Sawcut/Remove bituminous driveway <br />Lump sum <br />1 <br />$1,641.501 $1,641.50 <br />2506.502 <br />2 <br />Install catch basin tops <br />Each <br />2 <br />$695.18 $1,390.36 <br />2506.601 <br />3 <br />24" MH castings and Low profile catch basin castings <br />Lump sum <br />1 <br />$4,731.201 $4,731.20 <br />CHANGE ORDER 2 <br />2104.6011 1 1 Concrete curb and gutter Lump sum 1 1 $12,735.001 $12,735.00 <br />PROJECT 1302 TOTAL $793,431.56 <br />