Laserfiche WebLink
No.Item Unit Quantity Unit Price Total Price <br />CONSTRUCTION COST SUBTOTAL $1,402,843.00 <br />DESIGN & CONSTRUCTION CONTINGENCY (10%)$140,284.30 <br />SOFT COSTS (Design, Legal, Testing, Admin. 16%)$246,900.37 <br />ESTIMATED PROJECT TOTAL COST $1,790,027.67 <br />OPTIONAL ADD ALTERNATES <br />6' Fencing around Entire Lacrosse Field, with Gates LF 860 $22.00 $18,920.00 <br />Artificial Turf on Lacrosse Field Rather than Grass LS 1 $1,100,000.00 $1,100,000.00 <br />Concession Stand with Storage Space (Pre-Packaged Foods)SF 400 $175.00 $70,000.00 <br /> SUBTOTAL: ADD ALTERNATES $1,188,920.00