My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.01.27 WS Packet
NewBrighton
>
Council
>
Packets
>
2015
>
2015 Council Work Session Materials
>
2015.01.27 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2015 2:24:41 PM
Creation date
2/2/2015 2:24:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No.Item Unit Quantity Unit Price Total Price <br />CONSTRUCTION COST SUBTOTAL $1,402,843.00 <br />DESIGN & CONSTRUCTION CONTINGENCY (10%)$140,284.30 <br />SOFT COSTS (Design, Legal, Testing, Admin. 16%)$246,900.37 <br />ESTIMATED PROJECT TOTAL COST $1,790,027.67 <br />OPTIONAL ADD ALTERNATES <br />6' Fencing around Entire Lacrosse Field, with Gates LF 860 $22.00 $18,920.00 <br />Artificial Turf on Lacrosse Field Rather than Grass LS 1 $1,100,000.00 $1,100,000.00 <br />Concession Stand with Storage Space (Pre-Packaged Foods)SF 400 $175.00 $70,000.00 <br /> SUBTOTAL: ADD ALTERNATES $1,188,920.00
The URL can be used to link to this page
Your browser does not support the video tag.