My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.02.17 PC Packet
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2015
>
2015.02.17 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2015 6:04:35 PM
Creation date
2/17/2015 6:02:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
interoffice <br />MEMORANDUM <br /> <br /> <br /> <br /> <br />to: Janice Gundlach, Assistant Director of Community Assets and Development <br />from: Craig Schlichting, Director of Community Assets and Development <br />subject: Eckson Development <br />date: February 11, 2015 <br /> <br />The Engineering Department and Public Works have reviewed the site plan and preliminary grading & <br />utility plans for Eckson and we offer the following comments: <br /> <br />Streets- <br /> <br />1. Portions of the existing curb and gutter and pavement on 13th Street and 12th Avenue NW will be <br />removed for extensions of 12th Avenue NW. Please include more detailed intersection elevations to <br />demonstrate water reaches the intended location (possibly including cross gutters for proper <br />drainage). <br /> <br />2. Small utilities including power lines will require relocation. Facilities should be placed underground <br />where possible. <br /> <br />3. Adjust the note on the plans indicating that the contractor must contact Dustin Lind in the Engineering <br />Department at 651-638-2055for inspection of all street and utility work. <br /> <br />4. The proposed lighting should be added to the plans and the appropriate light documents/details <br />should be provided to the Planning Department for review. <br /> <br />5. Portions of the existing street will be reconstructed based on disturbed areas from the sewer line <br />grade revisions. <br /> <br />Storm Sewer-Grading <br /> <br />1. Drainage calculations/areas including discharge rates, HWL’s and storm sewer sizing are included; <br />provide any updates with future submittals for our review. <br /> <br />2. A permit will be required from the Rice Creek Watershed District. The RCWD recognizes a HWL <br />which is higher than FEMA. Compensatory storage for any fill within the HWL will be required. <br /> <br />3. If a cross gutters is required to properly drain the intersection it will need to be shown on the plans. <br /> <br />4. Site storm sewer will discharge into a new stormwater basin. The City will maintain this feature and <br />an access route to the outlet structure must be provided. The stormwater calculations indicate a <br />sumped catch basin with a SAFL Baffle. Details to be provided.
The URL can be used to link to this page
Your browser does not support the video tag.