My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.02.17 PC Packet
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2015
>
2015.02.17 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2015 6:04:35 PM
Creation date
2/17/2015 6:02:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />3 <br /> <br />Not Approved <br />Motion by Commissioner Danger, seconded by Commissioner Erickson to continue the Public Hearing to the <br />February 17, 2015 Planning Commission meeting. <br /> <br />Approved 7-0. <br /> <br />(B) Paul Heuer on behalf of Pulte Group requests Final Plat and Final Planned Unit Development approval <br />for Outlots C, D, E and G, ENCLAVE AT NEW BRIGHTON EXCHANGE, platting 36 lots for <br />development of 36 townhomes and 28 lots for development of 28 single family homes, to be known as <br />ENCLAVE AT NEW BRIGHTON EXCHANGE PLAT 2 AND PLAT 3, respectively. <br /> <br />Assistant Director of Community Assets & Development/Planning Director Janice Gundlach reported Pulte Homes is <br />requesting Final Planned Unit Development (PUD) and Final Plat approval for the following remaining efforts at The <br />Enclave at New Brighton Exchange: <br /> <br /> Enclave at New Brighton Exchange 2nd Addition: Pulte is seeking final PUD and final plat approval for <br />construction of 36 townhome units. The plat consists of 36 lots on two blocks, formerly platted as Outlots C and <br />D. 30 units will front on Old Highway 8 NW and six units will front on Central Park Boulevard. Garages are <br />located in the rear of the unit, accessible off a private driveway. Preliminary PUD and plat approval were granted <br />in September of 2013. The overall concept is generally consistent with the preliminary PUD approval, except four <br />additional units have been incorporated, the actual townhome product is different, and one building is now <br />proposed to front on Central Park Boulevard. <br /> <br /> Enclave at New Brighton Exchange 3rd Addition: Pulte is seeking final PUD and final plat approval for the <br />remaining 28 single-family homes. The plat consists of 28 lots on two blocks, and dedication of public right-of- <br />way to be known as 14th Street NW, Searles Street, and Hipp Circle, all formerly platted as Outlot G. The plan <br />(lot layout, lot area, setbacks, and home type) is consistent with what was approved during the preliminary PUD <br />approval. <br /> <br />Pulte Homes secured Preliminary PUD and Preliminary Plat approval on September 24, 2013 via Resolution 13-076 <br />(attached). Included in this approval was Final PUD and Final Plat approval for the first phase of development, which <br />consisted on 61 single-family homes. Those homes are under construction and sales have begun. The current request <br />consists of the remaining homes in the development. The applicant has outlined construction timetables within the <br />narrative for each phase. Interest remains high for these homes, so the timing of Pulte’s request for the remaining <br />lots/homes within the development positions them to be able to sell homes and hopefully meet an expected high demand. <br />Per the original PUD approval, Pulte has until December 31, 2019 to complete the development. <br /> <br />It should also be noted that because of the length of time it took the Minnesota Pollution Control Agency to approve the <br />development, the construction commencement date (the date by which construction must begin) has been extended by <br />City Council action several times. Additionally, the construction compliance date (the date where all construction must be <br />complete) has been extended one year to December 31, 2019. The construction commencement and compliance dates are <br />specified at the time of land use approval. <br /> <br />Staff recommends approval of the Final Plat and Final PUD for The Enclave at New Brighton Exchange 2nd & 3rd <br />Additions, subject to the following conditions: <br /> <br />1. Compliance with the conditions of Resolution 13-076, unless otherwise revised herein. <br />2. The applicant executes a Declaration of Covenants & Restrictions and a Subdivision Agreement for the 2nd and <br />3rd Additions, prior to City release of the Final Plat. <br />3. Incorporation of the Interoffice Engineering/Public Works memos dated 1/14/2015. <br />4. The 30% brick/stone standard for the townhomes, as required via the Preliminary PUD, shall be eliminated. <br />Instead, the townhomes shall be built consistent with the design submitted as part of this application and include <br />the architectural features described in the applicant’s written narrative, made an exhibit to this report.
The URL can be used to link to this page
Your browser does not support the video tag.