My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.06.23 Packet Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.06.23 Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2018 9:54:27 PM
Creation date
2/1/2016 10:30:56 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />ORDER OWNER [X ] <br />ARCHITECT [X ] <br />IBSTITUTE CONTRACTOR [X <br />•'d DOCUMENT G701-1987 FIELD [ ] <br />OTHER [ ] <br />PROJECT: New Brighton Community Center <br />Restroom, Locker Room, and Family Area Remodel. <br />(name, address) 400 10th Street NW <br />New Brighton, MN 55112 DATE <br />TO CONTRACTOR: Rochon Corporation <br />(name, address) 3650 Annapolis Lane N #101 <br />Plymouth MN 55447 <br />The Contract is changed as follows: <br />CR# <br />5R. New Toilet Fixtures. <br />8. Revised HVAC — RFI #10 - <br />9. Added Shutoff Valve <br />10. Sanitary Line Demolition. <br />12. Fireproofmg Drywall in 113. <br />14. Isolation Valves. <br />CHANGE ORDER NUMBER: 2 <br />December 17'h, 2014 <br />ARCHITECT'S PROJECT NO: 21325 <br />CONTRACT DATE: August 27th, 2014 <br />CONTRACT FOR: General Construction <br />Total $5,308.69 <br />"-)t valid until signed by the Owner, Architect and Contractor. <br />The original (Contract Sum) was ................................................. $682,000.00 <br />Net change by previously authorized Change Orders .................................. $2,000.29 <br />The (Contract Sum) prior to this Change Order was .................................. $684,000.29 <br />The (Contract Sum) will be (increased) <br />by this Change Order in the amount of ......................................... $5,308.69 <br />The new (Contract Sum) including this Change Order will be ....................................... $689,308.98 <br />$2,505.03 <br />$362.41 <br />$105.00 <br />$1,407.00 <br />$89.25 <br />$840.00 <br />The Contract Time will be (increased) by ( 7 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is: <br />NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by <br />Construction Change Directive. <br />Rosa Architectural Group <br />ARCHITECT <br />1084 Sterling Street N <br />St. Paul, MN 55119 <br />Rochon Corporation <br />CONTRACTOR <br />3650 Annapolis Lane N #101 <br />Plymouth MN 55447 19 <br />a, s <br />City of New Brighton <br />OWNER <br />803 Old Hwy 8 NW <br />New Brighton, MN 55112 <br />DATE:—['- " Q ^ DATE: 12,117 DATE: (�1 <br />ON -.aN 1.4 (LI Z; � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.