My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.08.11 Packet Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.08.11 Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:47:58 PM
Creation date
2/1/2016 12:44:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. All materials and equipment are available and delivered to WTP1 site no later than September <br />30, 2015; and <br />c. WTP1 is off-line and not producing potable water during treatability testing in plant. <br />ACCEPTED AND AGREED TO: <br />BARR ENGINEERING CO. <br />By: <br />Gregory D. Keil <br />Title: Vice President <br />Date: <br />CITY OF NEW BRIGHTON <br />By: <br />Title: <br />Dean R. Lotter <br />City Manager <br />Date: <br />By: <br />Title: <br />Dave Jacobsen <br />Mayor <br />Date: <br />P:\Mpls\23 MN\62\23621176 New Brighton DX Response\23621176.00 Initial Page 3 of 3 <br />Response\ProjRiskMgmt\Contracts\New Brig hton_DXResponse_WorkOrderOl_PiIotTesting _Final.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.