My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.08.11 Packet Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.08.11 Packet Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 7:47:58 PM
Creation date
2/1/2016 12:44:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For risk management purposes, Barr has assumed that WTP1 will be closed to the public (including <br />tours and other non-essential public presence) while treatability studies are being conducted within <br />the plant. <br />II. Maximum Compensation and Assumptions ("Service Assumptions") Upon Which Maximum <br />is Based <br />The Services are to be performed on the basis of actual time and expenses incurred. <br />There is no Maximum Compensation limit <br />The following is the current estimate of the anticipated cost of the work for budgeting purposes. This <br />estimate is based on preliminary information that does not include firm price commitments from <br />technology vendors and subcontractors: <br />Cost Category <br />Initial Cost <br />Monthly Cost <br />Total <br />Estimated <br />Cost <br />Mobilization and commissioning of treatment <br />$98,000 <br />$8,000 <br />$146,000 <br />equipment <br />Connection of treatment equipment and <br />$75,000 <br />- <br />$75,000 <br />existing facility modifications <br />Operation of pilot equipment and coordination <br />$60,000 <br />- <br />$60,000 <br />with client staff and vendors during pilot <br />Sample collection and shipping, laboratory <br />$292,000 <br />- <br />$292,000 <br />analysis, data quality review, and data <br />management <br />Data analyses, evaluation and report <br />$95,000 <br />- <br />$95,000 <br />Nominal Total —Current Estimate <br />$668,000 <br />Based on an anticipated range of final cost ranging from -15% to +30% of the preliminary estimate, <br />the final cost could range from about $570,000 to $870,000. <br />III. Schedule and Assumptions Upon Which Schedule is Based <br />Completion of Testing in WTP1: April 30, 2016. <br />Completion of Draft Report for Client Review: June 30, 2016. <br />Schedule Assumptions: <br />a. Purchase commitments for critical equipment leasing can be made immediately following <br />execution of this Work Order and no later than August 12, 2015; <br />P:\Mpls\23 MN\62\23621176 New Brighton DX Response\23621176.00 Initial Page 2 of 3 <br />Response\ProjRiskMgmt\Contracts\New Brig hton_DXResponse_WorkOrderOl_PiIotTesting _Final.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.