My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015.11.10 CC and WS Combined
NewBrighton
>
Council
>
Packets
>
2015
>
2015.11.10 CC and WS Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 8:53:44 PM
Creation date
2/1/2016 3:27:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Treatment Plant 4's filter treatment residuals are discharged after 24 hours detention in an open <br />holding tank. The top clean water is currently discharged to Jones Lake. <br />WTP 4 and 5 have recently been refurbished with improvements including; new filter under drain, new <br />filter media, baffle walls to increase detention time and paint coatings. <br />Discharging water to the environment rather than recycling the water results in additional cost to the City <br />in several forms including higher labor costs, associated permitting fees, lab testing fees, and additional <br />energy consumption. <br />With City Project 15-13, Staff recommends preparing plans and specifications to recycle/reclaim the <br />backwash water at WTP 3 and 4. Staff will return to the City Council when plans are complete to <br />authorize bids in 2016. <br />Vessel 3A Rehabilitation <br />In 2004, the Minnesota Department of Health (MDH) notified the City that four of our deep drinking <br />water wells were found to exceed the regulatory level of 5.4 PicoCuries per liter for radium. In 2005, <br />City water department personnel installed new special chemical feed equipment at City Water Treatment <br />Plants 3, 3A, 4 and 5 in hopes of reducing the radium to below the regulatory level. The chemical feed <br />equipment was a minimal cost solution but unfortunately did not correct the radium problem. In August <br />of 2005, the City received a Notice of Violation from MHD ordering the City to develop a plan to reduce <br />the radium to acceptable levels. <br />In conjunction with the MDH, the City signed a Bilateral Compliance Agreement with the Minnesota <br />Department of Health (MDH). Essentially, the agreement stated the City must return Water Treatment <br />Plants 3 & 3A to compliance in 2006, Water Treatment Plant 4 in 2007, and Water Treatment Plant 5 in <br />2008. <br />In 2006, the City removed the filter media in the two filters at Water Treatment Plants 3 and 3A and <br />replaced it with a finer filter material, inspected the filter interiors for corrosion, and made coating repairs <br />as necessary. At the same time a different complex chemical feed system was installed. The work was <br />completed and has reduced the radium levels below 5.4 picocuries per liter for radium as required by the <br />MDH. <br />In 2007 at Water Treatment 4, and in 2008 at Water Treatment 5, the City installed new finer filter media <br />while reusing the existing chemical feed system, sandblasted and painted the entire filter interior to <br />remove the existing corrosion and installed an airwash system to assist with the backwash process. The <br />work was completed has reduced the radium levels below 5.4 picocuries per liter for radium as required <br />by the MDH. <br />With City Project 15-13, Staff recommends preparing plans and specifications for Vessel 3A <br />Rehabilitation: including removal of the existing media, blasting of the entire vessel interior (and <br />disturbed portion of the exterior), new filter under drain, new filter media, installation of welded baffle <br />walls, and new paint coatings. This work may be delayed until after improvements are made to WTP 1 <br />(2018) to avoid the possibility of limiting the volume of water available at a given time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.