My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
842-849 2016 Ordinances
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0801-
>
842-849 2016 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2016 11:46:12 AM
Creation date
12/23/2016 11:44:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Brighton 2017 Fee Register <br />BUILDING: <br />Description <br />2017 <br />General Work: BUILDING/FIRE SPRINKLER AND ALAPM FEES <br />Building permit issuance charge (Base Charge) <br />$31 00 <br />Sprinkler permit issuance charge (Base fee) <br />$3100 <br />Value of Work (Additional Charge): <br />$1 to $500 <br />$31 00 <br />$501 to $2,000 <br />$31 00 for the first $500 plus $3 80 for each add'I <br />$2,001 to $25,000 <br />$25,001 to $50,000 <br />$50,001 to $100,000 <br />$100,001 to $500,000 <br />$500,001 to $1,000,000 <br />$1,000,001 and up <br />Residential plan review fee <br />Commercial plan review fee due at the time plan is dropped off <br />Accelerated review (Total x 2) Review completed within 15 business days <br />or %: of the submitted fee refunded <br />Administrative Fee <br />State Surcharge Fee <br />Replacement inspection record card <br />Restampingjob site plan sets <br />Footing/foundation permit prior to full permit issuance <br />- Residential & Commercial <br />Certificate of Occupancy <br />- Temporary/Conditional Certificate of Occupancy <br />- Full Certificate of Occupancy <br />Site Assessment for Fire Works <br />Temp Membrane Structure, Tents & Canopies - Greater than 120 Sq Ft <br />Demolition <br />Plumbing <br />Sump pump inspection <br />Residential Plumbing permit issuance charge <br />Water Heater <br />Water Softener <br />RPZ (Backflow Device) <br />Commercial & Industrial Permit <br />Administrative Fee <br />Commercial Plan Review Fee <br />Accelerated review (Tota] x 2) Review completed within 15 business days <br />or 1/2 of the submitted fee refunded <br />State Surcharge Fee <br />Mechanical <br />Mechanical permit issuance fee <br />Mechanical Permit <br />Residential I & 2 family dwelling <br />Other <br />Commercial & Industrial <br />Temp heat permit <br />Commercial Plan Review Fee <br />Accelerated review (Total x 2) Review completed within 15 business days <br />or %z of the submitted fee refunded <br />Administrative Fee <br />State Surcharge Fee <br />$100 or fraction thereof up to & including $2,000 <br />$88 00 for the first $2,000 plus $18.00 for each add'l <br />$1,000 or fraction thereof up to & including $25,000 <br />$488 00 for the first $25,000 plus $12 50 for each add'I <br />$1,000 or fraction thereof up to & including $50,000 <br />$804 50 for the first $50,000 plus $8 50 for each add'[ <br />$1,000 or fraction thereof up to & including $100,000 <br />$1,249 00 for the fust $100,000 plus $7 00 for each addI <br />$1,000 or fraction thereof up to & including $500,000 <br />$4,091 00 for the first $500,000 plus $5 60 for each add'I <br />$1,000 or fraction thereof up to & including $1,000,000 <br />$6,985 60 for the first $1,000,000 plus $4 50 for each <br />add] $1,000 or fraction thereof. <br />50% of permit fee (does not apply on jobs valued at <br />less than $200.00) <br />65% of permit fee <br />$1700 <br />0005% x valuation of job (minimum fee = $1 00) <br />$1700 <br />S2700 <br />Based on Valuation of a full building permit, minus <br />the plan review, plus a full building permit upon <br />the issuance of the shell permit <br />$500 00 plus a letter of credit equal to the remaining zoning requirements <br />$1600 <br />S10000 <br />S8850 <br />$79 00 flat fee for residential, valuation based for non-residential with $79 minimum fee <br />$6300 <br />Minimum $52 50 or 1 5% of project cost or which ever is greater <br />$5250 <br />S5250 <br />$5800 <br />$15800 <br />$1700 <br />City will review plans that are valued less than $1,500 00. <br />Plan Review Fee will be 50% of permit Work valued over $1,500 00 will need to be <br />reviewed by the State of Minnesota <br />0005% x valuation ofjob (minimum fee = $1 00) <br />S4750 <br />1 5% of contract cost <br />$132 50 (New Constructon; 1-2 Family Dwelling <br />$47 50 (Furnace) <br />$47 50 (Gas/Electric Range) <br />$47 50 (Gas Piping) <br />$47 50 (Air Conditioning) <br />$68 00 (Gas Line*/Fireplace) <br />$47 50 (Other) <br />Maximum of $47 50 or 1 5% of the improvement cost <br />whichever is greater <br />$10500 <br />45% of Permit Fee <br />$1700 <br />0005% x valuation of job (minimum fee = $1 00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.