Laserfiche WebLink
New Brighton 2017 Fee Register <br />BUILDING: <br />Description 2017 <br />Building Moving Fees <br />Pre -inspection fee <br />S7900 <br />Moving Principle Building into City <br />S31600 <br />Moving over private property <br />$31 00 <br />Moving over public streets <br />$79/Hr <br />Larger than 12 ft high, 14 feet wide, 25 Feet long <br />$7900 <br />No larger than 12 feet high, 14 feet wide, 25 Feet long <br />$4200 <br />Excavating / Grading Fees <br />50 cubic yards or less <br />$4450 <br />51 to 100 cubic yards <br />$51 50 <br />101 to 1,000 cubic yards* <br />$50 00 for first 100 cubic yards, plus $11 00 for each <br />Water and Sewer Connection Fee <br />additional 100 yards or fration thereof. <br />1,001 to 10,000 cubic yards <br />$175 00 for first 1000 cubic yards, plus $9 00 for each <br />City Sewer Maintenance Fee (per SAC) <br />additional 1000 yards or fration thereof. <br />10,001 to 100,000 cubic yards <br />$287 00 for fust 1000 cubic yards, plus $42 00 for each <br />Connection charges <br />additional 10,000 yards or fration thereof. <br />11X1,001 + cubic yards or more <br />$697 50 for first 100,000 cubic yards, plus $24 00 for each <br />Manufactured Home Set -Up <br />additional 100,000 yards or fration thereof. <br />Administrative Fee <br />$1700 <br />i Over 100 Cubic Yards is required to pull a SWWPP Permit <br />$16.00 <br />Other Inspection Fees <br />Inspections outside of normal business hours • <br />S95/Hr <br />(Minimum charge - two hours) <br />Reinspection fees <br />$79/Hr <br />Inspections for which no fee is specifically indicated <br />$79/Hr <br />Additional plan review required by changes, <br />$79/Hr <br />Additions or revisions to plans (Minimum <br />charge one hour) <br />Change of address <br />S4200 <br />• Or the total hourly cost to the jurisdiction, whichever is greatest This cost shall include supervision, <br />overhead, equipment, hourly wages fringe benefits of the employee involved <br />Water and Sewer Connection Fee <br />MCES Fee (per SAC) <br />$2,48500 <br />City Sewer Maintenance Fee (per SAC) <br />$10300 <br />Please see Pub] is Works for additional Sewer Access and Water <br />Connection charges <br />Manufactured Homes <br />Manufactured Home Set -Up <br />$7900 <br />Manufactured home Inspection Sell/Buy <br />$131 50 <br />Each Additional Width Set -Up <br />$16.00 <br />Administrative Fee <br />$1700 <br />State Surcharge Fee <br />0005% x valuation ofjob (minimum fee = $1 00) <br />Electrical Fees <br />Fees shall be paid according to the following schedule: State surcharge of $5 00 added to all permit fees <br />Minimum Fees: <br />1) Minimum fee for each separate residential inspection of an installation, replacement, alteration, or repair limited <br />to <br />$42 00 for each circuit and feeder Maximum fee <br />one inspection only <br />not to exceed $160 00 <br />2) Services, changes of services, temporary services, additions, alterations or repairs on either primary <br />secondary services shall be computed separately: <br />0 - 200 ampere capacity <br />$4200 <br />For each additional 100 ampere capacity or fraction thereof <br />$800 <br />3) Circuits, installations of, additions, alterations, or repairs of each circuit or sub -feeder shall be <br />computed separately, including circuits fed from sub -feeders and including equipment served, except <br />as otherwise provided for in (1) through (8): <br />Reconnect Feeder and Circuits <br />$300 <br />