My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016.08.03 PREC Packet
NewBrighton
>
Commissions
>
Parks and Recreation
>
Parks and Rec Packets
>
2016
>
2016.08.03 PREC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:35:26 AM
Creation date
1/12/2017 11:44:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />be developed. Next the group drove to the South end of the development to view the <br />South Park Trail that was built in 2010. The group viewed Central Park and talked <br />about the green space and how Central Park and the East side of the development will <br />connect. A potential bridge over the railroad in Centra l Park was discussed. <br /> <br />Veteran’s Park: <br />The park was established in the 1940’s. The playground was installed in 2008. The <br />Gazebo was installed in 1989 and is due for replacement. Discussions focus on the <br />gazebo and its replacement. <br /> <br />The tour group returned to New Brighton Community Center. <br /> <br /> <br />Respectfully submitted by, <br /> <br /> <br /> <br />Sandy Breuer <br />Director of Parks and Recreation
The URL can be used to link to this page
Your browser does not support the video tag.