My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.04.25 WS Agenda C
NewBrighton
>
Council
>
Packets
>
2017
>
2017.04.25 WS Agenda C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:15 PM
Creation date
1/3/2018 11:33:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the cost for poured in place surfacing increased as well. There is also the need <br />for additional drain tile to be placed under the larger footprint. <br /> <br />The vendors also brought up a concern that warranties may not be in effect if the <br />selected playground vendor does not also install the surfacing. There are <br />requirements for fall attenuation that must be met in the surfacing. One of the <br />playground vendors concerns was that the surface might not be safe enough for <br />the height of their equipment. When this concern was brought forward, <br />negotiations have been in place with Ramsey for a deduction for not installing the <br />container and poured in place surfacing of the playground. <br /> <br />The total cost of the recommended play structure is $214,471.65. Currently <br />there is funding earmarked totaling $164,975 for the playground. The Couch <br />Family Foundation has also donated $1,000 for the project. Other groups have <br />expressed an interest in donating funds for the playground.
The URL can be used to link to this page
Your browser does not support the video tag.