My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.06.06 WS Agenda C
NewBrighton
>
Council
>
Packets
>
2017
>
2017.06.06 WS Agenda C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:15 PM
Creation date
1/3/2018 4:21:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Memo <br /> <br />To: Mayor and Council Members <br /> Manager Lotter <br />From: Bill Bach, Facilities Manager <br />Subject: Eagles Nest Replacement Project Update <br />Date: May 30, 2017 <br /> <br />Staff has furthered the research about the Eagles Nest Indoor Playground <br />Replacement. Below is further information about the questions asked of staff at <br />the May 26 Council Meeting. <br /> <br />Best Value Procurement Process <br /> <br />The Best Value Procurement is a process that considers factors other than only <br />price, such as quality and expertise to select a vendor for a project. The process <br />generally has prerequisites a vendor needs to meet prior to becoming a qualified <br />proposal. For the Eagles Nest, the prerequisites included: <br /> <br /> A not to exceed cost of $413,230 <br /> Attending an on-site inspection <br /> Performance on three similar sized projects <br /> Provide information showing the proposed structure is in compliance with <br />all applicable codes and standards <br /> Affidavit of Non-Collusion <br /> Plan meets the design conditions set forward in the supplementary <br />specifications. <br /> Post and pad system minimum size to be 2" or 3.5" non-padded system <br /> Foam posts shall be single piece vinyl coated material with safety pull ties <br />throughout <br /> Double molded platforms <br /> 16 gauge, 1/2 inch steel vinyl coated metal mesh netting <br /> Meets and identify ADA compliance and routes <br /> Meets project timeline <br /> <br />Proposals that met these prerequisites were moved along to the next stage in the <br />process which was the presentation and scoring of the design. Council
The URL can be used to link to this page
Your browser does not support the video tag.