Laserfiche WebLink
equipment costs are still within the anticipated range. However, as the footprint increased, the <br />cost for safety surfacing increased as well. There was also the need for additional drain tile to be <br />placed under the larger footprint. <br /> <br />It was also determined the safety surfacing which was originally included in the contract with <br />Ramsey should be installed by a playground vendor. This is due to a couple of issues. One being <br />mobilization costs. Ramsey has finished the scope of their work, and it would be cost prohibitive <br />to have them return. A second is that a playground vendor will ensure the correct depths of <br />surfacing are installed to provide fall protection for playground users. Playground vendors <br />indicated they would not honor warranties if they did not install the safety surfacing. <br /> <br />Staff recommends Council approves the purchase of playground equipment from Miracle <br />Recreation Equipment and safety surfacing from Weber Recreational Designs. <br /> <br /> <br /> <br />________________________________________ <br />Jason Hicks <br />Acting Parks and Recreation Director <br /> <br />Attachments: <br /> Miracle Recreation Quote <br /> Webber Recreational Designs Estimate