My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.09.12 CC Agenda C
NewBrighton
>
Council
>
Packets
>
2017
>
2017.09.12 CC Agenda C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 4:46:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page - 2 | METROPOLITAN COUNCIL <br /> <br /> <br /> <br />Enter Your Estimated Project Work Description: <br /> <br />Enter Your Estimated Eligible I&I Costs (Column A): <br /> <br /> <br />Type of work: <br />(A) Estimated <br /> Project Costs: <br /> (B) Covered: 50% <br />of Project Costs <br />(C) % Eligible <br />for funding <br />(D)Amount Eligible <br />For Grant Funding <br />1. Pipe Lining and Replacement $100,000 X 50% = $50,000.00 X 50% = $25,000.00 <br />2. Pipe Joint Sealing and chimney Seals X 50% = $ 0.00 X 100% = $ 0.00 <br />3. Manholes – Lining, replacement X 50% = $ 0.00 X 50% = $ 0.00 <br />4. Manhole Sealing joints, castings, covers X 50% = $ 0.00 X 100% = $ 0.00 <br />5. Flood Mitigation X 50% = $ 0.00 X 10% = $ 0.00 <br />6. Cross Connection Elimination X 50% = $ 0.00 X 100% = $ 0.00 <br />Total: $100,000.00 $50,000.00 $25,000.00 <br /> <br />Non-Eligible I&I Work: <br /> Studies, investigations, or inspections <br /> Engineering costs <br /> Any improvements to privately owned infrastructure <br /> <br /> <br /> <br /> <br />In 2018, The City of New Brighton plans on cleaning and repairing 3,225 lineal feet of sanitary sewers. This <br />includes pipe lining and replacement to reduce the amount of root infiltration and inflow of the pipline. <br /> <br />New Brighton has identified older portions of New Brighton for maintenance. This includes the following streets <br />between 8th Street NW and County Road E2: <br />- 4th Avenue NW <br />- 3rd Avenue NW <br />- 2nd Avenue NW <br />- 1st Avenue NW <br />The estimated amount of pipe lining to be updated is 3,225 feet. <br />The estimated construction cost to complete approximately 3,225 lineal feet of pipe lining at $31/foot is <br />$100,000. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.