Laserfiche WebLink
PUBLIC WORKS PROJECTS <br />Department: Water <br />Item: Re-painting 5th Street Storage Tank Reservoir <br />Year(s): 2018 – Spot Painting <br />2026 – Total Reconditioning <br />Cost: 2018 – $150,000 <br />2026 – $575,000 <br />Description: The 1,300,000 gallon ground storage reservoir is located next to the <br />PGAC Plant. This tower was built in 1961. The last maintenance was a complete interior <br />and exterior blast and repainting in 2002. In 2002, This tower was painted and the <br />coating system was changed from epoxy/urethane to an Ameron PSX 700. This change <br />in coatings represents about a 20% increase in the coating life and a retained glossy <br />appearance for 24 years compared to about 12 years for the epoxy/urethane. <br />Justification: This is scheduled tank maintenance. <br />5th Street <br />Storage <br />Reservoir <br />Page 10