Laserfiche WebLink
PUBLIC WORKS PROJECTS <br />Department: Water <br />Item: Re-painting Forestdale Water Tower <br />Year(s): 2023 <br />Cost: $550,000 <br />Description: The 300,000 gallon Forestdale Water Tower is located at the northwest <br />corner of Silver Lake Road and Forestdale Road. This tower was built in 1955. The last <br />maintenance was a complete interior and exterior blast and repainting in 2001. This <br />tower underwent minor interior / exterior repairs and coating touch-ups in 2013. This <br />tank will be re-inspected again in 2017. This tower will be due for a complete paint <br />project in 2023. The coating systems of today are better quality then when this tank was <br />repainted. It is expected this paint job will last 20 to 25 years. The inside will be coated <br />with an epoxy coating, and the outside with a polyurethane finish. <br />Justification: This is scheduled tank maintenance. <br />Forestdale <br />Water Tower <br />Page 11