My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.11.28 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.11.28 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:22:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br />Department: Water <br />Item: Re-painting High Service Tower <br />Year(s): 2033-2038 <br />Cost: $400,000 TBD <br />Description: The 150,000 gallon High Service Water Tower is located next to the <br />PGAC Plant. The purpose of this tower is to provide higher pressure for the areas around <br />Wexford Heights, Seminary Estates, and other nearby streets. This tower was built in <br />1992 and was re-painted in 2013. The coating systems of today are better quality then <br />when this tank was first painted. It is expected this paint job will last 20 to 25 years. <br />When repainting this tower, an interconnect with Columbia Heights is opened and service <br />is provided with Columbia Heights water. Prior to opening the interconnect; the two <br />Cities must enter an agreement defining the terms of use and repayment for water used. <br />Justification: This is scheduled tank maintenance. <br />High Service <br />Water Tower <br />Page 12
The URL can be used to link to this page
Your browser does not support the video tag.