My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.11.28 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.11.28 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:22:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br />Department: Water <br />Item: Re-painting South Water Tower <br />Year(s): 2029 <br />Cost: $2,000,000 TBD <br />Description: The 1,000,000 galloon South Water Tower is located at 660 5th Street SW <br />was originally constructed in 1975. The South Water Tower is a hydropillar type. The <br />interior wet surface was over coated in 1991 with the exterior surface over coated in <br />1996. In 2009 the entire Tower was re-painted. The coating systems of today are better <br />quality then when this tank was first painted. It is expected the 2009 paint job will last 20 <br />to 25 years. <br />Justification: This is scheduled tank maintenance. <br />South Water <br />Tower <br />Page 13
The URL can be used to link to this page
Your browser does not support the video tag.