My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.11.28 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.11.28 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:22:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br />Department: Water <br />Item: Treatment Plants 3, 4, & 5 and Well House 8 Building Improvements <br />A.Treatment Plant 3A Filter Rehab/Radium Removal <br />B.WTP 3A & 4 Backwash Reclamation Project <br />Year: <br />Cost: <br />2018 (Item A) <br />2018 (Item B) <br />Portions of Item A and all of B delayed based on use of deep wells during <br />interim response to 1,4-Dioxane <br />2020 (Building Improvements) <br />2018-$375,000, (Item A.) <br />2018-$250,000, (Item B.) <br />Portions of Item A and all of B delayed based on use of deep wells during <br />interim response to 1,4-Dioxane <br />Building Improvements (exterior treatments) <br />2020-$250,000 <br />2030-$335,000 <br />Description: The three iron removal plants were built in the mid 1980’s to supply <br />water to the City during negotiations with the Army. These plants and their respective <br />wells draw water out of the deeper Mount Simon / Hinckley aquifer. Well House 8 was <br />also modified and drilled deeper at this time. The City entered into a water remediation <br />agreement with the Army in 1990 and built a separate facility, the PGAC Plant, which <br />has supplied over 95% of the City’s water since then. The facilities needing attention <br />supply water during the hot dry summer months and are capable of supplying all the <br />cities water if a catastrophic failure should occur at the PGAC Water Treatment Plant. <br />In 2004, the Minnesota Department of Health (MDH) notified the City that four of our <br />deep drinking water wells were found to exceed the regulatory level of 5.4 picoCuries per <br />liter for radium. In 2005, City water department personnel installed new special chemical <br />feed equipment at City Water Treatment Plants 3, 3A, 4 and 5 in hopes of reducing the <br />radium to below the regulatory level. The chemical feed equipment was a minimal cost <br />solution but unfortunately did not correct the radium problem. In August of 2005, the <br />City received a Notice of Violation from MHD ordering the City to develop a plan to <br />reduce the radium to acceptable levels. <br />In conjunction with the MDH, the City signed a Bilateral Compliance Agreement with <br />the Minnesota Department of Health (MDH). Essentially, the agreement stated the City <br />must return Water Treatment Plants 3 & 3A to compliance in 2006, Water Treatment <br />Plant 4 in 2007, and Water Treatment Plant 5 in 2008. <br />Page 17
The URL can be used to link to this page
Your browser does not support the video tag.