My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.11.28 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.11.28 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:22:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In 2006, the City removed the filter media in the two filters at Water Treatment Plants 3 <br />and 3A and replaced it with a finer filter material, inspected the filter interiors for <br />corrosion and made coating repairs as necessary, and installed a different complex <br />chemical feed system. The work was completed and has reduced the radium levels below <br />5.4 picoCuries per liter for radium as required by the MDH. <br />In 2007 at Water Treatment 4, and in 2008 at Water Treatment 5, the City installed new <br />finer filter media while reusing the existing chemical feed system, sandblasted and <br />painted the entire filter interior to remove the existing corrosion and installed an airwash <br />system to assist with the backwash process. The work was completed has reduced the <br />radium levels below 5.4 picoCuries per liter for radium as required by the MDH. <br />Water Treatment Plant Information and History <br />Water Treatment Plant 3A is connected to Well 11. <br />Built: 1987 <br />Filter: Tonka Filter <br />Coating: Exterior re-coated in 1995 <br />Interior spot-coated in 2006 <br />Recommendations for future filter coatings and repairs: <br />• 2018 - Structural repairs, interior and exterior coating [$125,000] <br />•2018 - Install baffles in detention side to get better chemical mixing to aid with <br />radium removal. This work will be similar to work at WTP’s 4/5. [$250,000] <br />Water Treatment Plant 3 is connected to Well 8. Well 8 is located offsite and pumps to <br />the Well 11 site where this filter is housed) <br />Built: 1985 <br />Filter: General Filter <br />Coating: Exterior re-coated in 1995, minor touch-up on welding failures <br />Interior re-coated in 2006 with new filter media (TonkaZorb) <br />Recommendations for future coatings and repairs: <br />• 2026 - Install baffles in detention side to get better chemical mixing, new media <br />• 2026 - Recoat interior and exterior <br />Water Treatment Plant 4 is connected to Well 10. <br />Built: 1983 <br />Filter: General Filter <br />Coating: Exterior re-coated in 1995; 2007 touched up welded areas & spot failures. <br />Interior re-coated in 2007 with new filter media <br />Air scour system installed in 2007 <br />Recommendations for future filter coatings and repairs: <br />• 2027 - Interior and exterior coating, new media, under drain replacement <br />Water Treatment Plant 5 is connected to Well 12. <br />Built: 1987 <br />Filter: General Filter <br />Page 18
The URL can be used to link to this page
Your browser does not support the video tag.