My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017.12.12 WS
NewBrighton
>
Council
>
Packets
>
2017
>
2017.12.12 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 5:29:16 PM
Creation date
1/5/2018 5:27:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Old Highway 8/5th Avenue NW: <br />Operations <br />I-35W North Corridor Preliminary Design Project 9 <br />Existing Construction: <br />No Mitigation <br />Construction: <br />Mitigated <br />AM 10 10 10 <br />PM 25 65 15 <br />Overall Intersection Delay in seconds <br />Issue: <br />•NBT and EBL volumes increase ~100-150 cars in <br />p.m. peak hour <br />•EB approach experiences delay and queuing <br />Mitigation: <br />•Convert EBR turn lane to shared EBL/EBR turn <br />lane <br />•Restripe NB approach from Old Hwy 8 to 10th St <br />NW as 2 lanes <br />Installation: <br />•MnDOT updates striping and adds arrow placards <br />on mast arm for lane designations <br />Maintenance: <br />•Ramsey County maintains signal timing during <br />construction5thAve NW
The URL can be used to link to this page
Your browser does not support the video tag.