Laserfiche WebLink
  <br />  <br />EXHIBIT B  <br />  <br />Preliminary Estimate for Stormwater Irrigation Reuse Construction Cost  <br />(Monitoring, engineering and contingencies not included)  <br />  <br />Task Estimated Cost  <br /> City Metropolitan Council  <br />Site Investigation $2,500  ‐‐  <br />Plans and Specifications $2,500  ‐‐  <br />Construction    <br />Education (Publications and Kiosks) $5,000 ‐‐  <br />Underground Storage  ‐‐ $35,000  <br />Treatment (includes items below) ‐‐ $110,000  <br />Package treatment plant (filtration & UV)     <br />Hydro‐pneumatic tank    <br />Isolation Valve    <br />Backflow prevention, RPZ    <br />Valve Building Structure    <br />Electrical and Controls    <br />Delivery and Start‐Up    <br />Piping and Installation $40,000 $5,000  <br />Total $50,000 $150,000  <br />$200,000  <br />