Laserfiche WebLink
EJCDC No. C-941 (2002 Edition) <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the <br />Associated General Contractors of America and the Construction Specifications Institute. 1 <br />Change Order <br />No. _1 <br />Date of Issuance: April 5, 2018 Effective Date: April 5, 2018 <br />Project: Water Treatment Improvements Owner: City of New Brighton Owner's Contract No.: 15-13 <br />Contract: Water Treatment Plant No. 3 Improvements Date of Contract: 11/28/2017 <br />Contractor: MN Mechanical Solutions Engineer's Project No.: 193803277 <br /> <br />The Contract Documents are modified as follows upon execution of this Change Order: <br />Description: The proposed change to the contract price is necessary to: <br />A. Additional cost to paint the entire internal surfaces of Vessel 3A. The entire internal surface of the filter cells <br />is included in the base bid contract documents. Therefore, this additional cost is for the cost to coat the <br />detention basin space and the aeration chamber space for vessel 3A. Cost: $40,198 <br />B. Credit for not painting the internal surfaces of the filter cells for vessel 3 due to condition assessment <br />performed by KLM. Credit: $ 33,100 <br />C. Additional cost to provide new air wash valves for vessel 3. The additional cost includes the cost for the <br />valves only without markup or tax. Cost $13,500 <br />Attachments: The following supporting documents are attached: <br />1. Detailed cost proposal from MN Mechanical Solutions with email narrative of work. <br /> <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br />Original Contract Price: Original Contract  Working days  Calendar days <br /> Substantial completion (days or date): 140 days <br /> $567,000 Ready for final payment (days or date): 170 days <br /> <br />[Increase] from previously approved Change <br />Orders No.___________ to No.___________: <br />[No Change] from previously approved Change Orders <br />No.____________ to No.____________: <br /> Substantial completion (days): N/A <br /> $NA Ready for final payment (days): N/A <br /> <br />Contract Price prior to this Change Order: Contract Times prior to this Change Order: <br /> Substantial completion (days or date): 140 days <br /> $567,000 Ready for final payment (days or date): 170 days <br /> <br />[Increase] of this Change Order: [No Change] of this Change Order: <br /> Substantial completion (days or date): N/A <br /> $20,598 Ready for final payment (days or date): N/A <br /> <br />Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: <br /> Substantial completion (days or date): 140 days <br /> $587,598 Ready for final payment (days or date): 170 days <br /> <br /> <br />RECOMMENDED: ACCEPTED: ACCEPTED: <br />By: By: By: <br />Engineer (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature) <br />Date: 04/05/2018 Date: Date: <br /> <br />