My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018.04.10 CC
NewBrighton
>
Council
>
Packets
>
2018
>
2018.04.10 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 3:22:02 PM
Creation date
2/13/2019 2:52:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brighton flushed the entire system of groundwater and shut off the use of our deep wells. New Brighton has used <br />only Minneapolis water since July of 2016. <br /> <br />City Project 15-13 WTP 3 and 4 Backwash Reclamation and Vessel 3A Rehabilitation includes removal of the <br />existing media, blasting of the entire vessel interior (and disturbed portion of the exterior), new filter under drain, <br />new filter media, installation of welded baffle walls, and new paint coatings. The project also includes the <br />installation of a water reclamation system in WTP 3. This reclamation system will ultimately save the City money, <br />and not waste as much water to the environment thus eliminating the permit requirements for discharge monitoring. <br /> <br />Costs and Funding: The total cost of the backwash project will be funded from Fund 701 – Water Improvement <br />Fund. The cost of the filter rehab/radium removal project will be broken down between Fund 701 and Fund 206 <br />(radium related costs). <br /> <br /> <br /> <br /> <br />_____________________________ <br />Craig G. Schlichting, P.E. <br />Director of Community Assets & Development <br /> <br />Attachments: Change Order 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.