My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Benedictine Application and Plans.pdf
NewBrighton
>
Commissions
>
Planning
>
Public Hearing Items
>
2020 April 21 Public Hearing Items
>
Benedictine Health Center Rezoning and PRD
>
Benedictine Application and Plans.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2021 10:10:22 AM
Creation date
4/13/2020 11:53:31 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. RICE CREEK WATERSHED DISTRICT PERMIT APPLICATION <br /> Permit Fee <br /> (Check all that apply) <br /> Rule C (Stormwater Management Plans): Rule F (Wetland Alteration): <br /> Single Lot,Single Family Residential Development 0 Exemption $250 <br /> ❑ Home,accessory structure,driveway $150 ❑ <1 acre of mitigation required $875 <br /> All Other Development 0 i to 5 acres of mitigation required $1,750 <br /> ❑ <1 acre impervious surface $i000 0 >5 to io acres of mitigation required $3,500 <br /> ❑ -Ito 2.5 acres impervious surface $2,000 ❑ >io acres of mitigation required $5,250 <br /> CI >2.5 to 5 acres impervious surface $3,500 0 Banking Plan $1,750 <br /> ❑ >5 acres impervious surface $5,000+$1,000/ac>5* Rule G (Bridge, Culvert Er Utility Crossings): <br /> *Capped at$io,000,round down to the nearest whole acre ❑ All projects $Soo <br /> Rule D (Erosion Control Plans): Rule I (Drainage Systems): <br /> ❑ <2.5 acres of land disturbance $ioo 0 Public Ditch Alteration Plan $Soo <br /> O 2.5 to io acres of land disturbance $25o Rule J (Appropriation of Public Waters): <br /> ❑ >io acres of land disturbance $Soo ❑ All RCWD regulated appropriations $o <br /> Rule E (Floodplain Alteration): Rule L (Variances): <br /> ❑ No mitigation required $o ❑ See District Permit Variance Guidance Policy <br /> 0 Mitigation required $ioo <br /> NOTE: Permit fee is the cumulative total of all individual aspects of a project <br /> checked above. Government entities are exempt from permit fees. Total Permit Fee: $ 3,750 <br /> Applicant Signature <br /> "I understand that,as the permittee, I am legally accountable to ensure compliance with terms and conditions of the <br /> permit. I understand that I am not authorized to begin the project until I receive the permit and the permit sign is posted <br /> on site. If the project is modified, I will obtain approval by the Rice Creek Watershed District before I continue with the <br /> project. I authorize the District,and its agents,employees,officers and contractors,to enter the worksite at all <br /> reasonable times until permit closure to inspect the work authorized hereunder,and to take any reasonable action to <br /> address existing or threatened discharge of sediments or other pollutants into waters or offsite." <br /> "I recognize that as the permittee, I will be responsible for site conditions and permit compliance until the permit is <br /> closed or transferred by written RCWD approval to a subsequent property owner. I confirm that the Applicant address <br /> stated on the front of this form is the official address to which all notices and correspondence relating to this <br /> application are to be addressed, unless the address of an authorized agent appears below. I certify that I have <br /> thoroughly read and understand the above information." <br /> Signature of landowner Date <br /> Print signer's name <br /> Benedictine Care Centers <br /> Company (if applicable) Title <br /> 24 LAND USE APPLICATION: 1101 BLACK OAK DRIVE, NEW BRIGHTON, MN 55112 FEBRUARY 14,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.