Laserfiche WebLink
a future fire protection line which was identified during the Parks Comprehensive Plan facility  <br />tours.  <br />  <br />Financial Impact:  <br />Costs associated with the irrigation connection to municipal water will be funded from Fund 206.  <br />The additional work required to install the future fire protection line and hydrant will be funded  <br />from Fund 701.  <br />  <br />  <br />  <br />________________________________________  <br />Craig Schlichting, P.E.  <br />Director of Community Assets and Development  <br />  <br />Attachments:  <br /> Quotation Tab  <br /> Cost Allocation Tab  <br />  <br /> <br />