Laserfiche WebLink
CITY OF NEW BRIGHTON, MNQUOTES RECEIVED: WEDNESDAY, SEPTEMBER 18, 20191 MOBILIZATIONLUMP SUM 1 $5,000.00 $5,000.002 CLEAR AND GRUB TREEEACH 3 $500.00 $1,500.00 3 $1,500.003 REMOVE CURB AND GUTTERLIN. FT. 40 $10.00 $400.00 40 $400.004 REMOVE BITUMINOUS PAVEMENT SQ. YD. 51 $9.00 $459.00 51 $459.005 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN. FT. 130 $5.00 $650.00130$650.006 AGGREGATE BASE CLASS 5TON25$28.00$700.0025$700.007 BITUMINOUS MATERIAL FOR TACK COATGAL.8$10.00$80.008$80.008 TYPE SP 12.5 WEARING COURSE MIXTURE SPWEB340CTON9$150.00 $1,350.009$1,350.009 TYPE SP 12.5 NON WEARING COURSE MIXTURE SPNWB330CTON11$150.00 $1,650.0011$1,650.0010 CONNECT TO EXISTING WATERMAINEACH1 $5,800.00 $5,800.001$5,800.0011 4" GATE VALVE AND BOXEACH1$550.00$550.001$550.0012 6" GATE VALVE AND BOXEACH1 $1,200.00 $1,200.001$1,200.0013 HYDRANT WITH 6" GATE VALVEEACH1 $6,300.00 $6,300.00 1$6,300.0014 4" WATERMAIN HDPE SDR 11 (DIPS) (DIRECTIONAL DRILLED)LIN. FT. 380$45.00 $17,100.00380$17,100.0015 6" WATERMAIN HDPE SDR 9 (DIPS) (DIRECTIONAL DRILLED)LIN. FT. 93$85.00 $7,905.0093$7,905.0016 4" WATERMAIN DUCT IRON CL 52LIN. FT. 30$65.00 $1,950.0030$1,950.0017 6" WATERMAIN DUCT IRON CL 52LIN. FT. 30$65.00 $1,950.00 30$1,950.0018 DUCTILE IRON FITTINGSPOUNDS 540$6.00 $3,240.00 141$846.00 399$2,394.0019 CONCRETE CURB AND GUTTER (SPOT REPAIR)LIN. FT. 40$50.00 $2,000.0040$2,000.0020 STORM DRAIN INLET PROTECTIONEACH2$350.00$700.002$700.0021 TRAFFIC CONTROLLUMP SUM 1 $2,500.00 $2,500.001$2,500.0022 2" TOPSOIL W/ MNDOT SEED MIX 25-151, FERTILIZER, AND EROSION CONTROL BLANKET SQ. YD. 100$30.00 $3,000.00 50$1,500.00 50$1,500.00$65,984.00$10,596.00$50,388.00FUND 701ESTIMATED QUANTITYTOTAL COSTQUOTATION TOTALUNITESTIMATED QUANTITYDESCRIPTIONNO.FUND 206ESTIMATED QUANTITYTOTAL COSTCOST ALLOCATION TABULATIONPROJECT 19-5, BRIGHTWOOD HILLS GOLF COURSE IRRIGATION SERVICE UNIT PRICEDAVE PERKINS CONTRACTING, INC.TOTAL COSTN:\ENG\2019 proj\19-5 Brightwood Hills Golf Course Irrigation Service\COST ALLOCATION TAB19/19/2019