My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.11.16 CC Packet
NewBrighton
>
Council
>
Packets
>
2019
>
2019.11.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:40:07 AM
Creation date
12/16/2020 3:28:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />REQUEST FOR CITY COUNCIL CONSIDERATION <br /> <br />ITEM DESCRIPTION: CONSIDER PROFESSIONAL SERVICES AGREEMENT WITH BOLTON & <br />MENK, INC. AND AUTHORIZE PREPARATION OF PLANS AND SPECIFICATIONS FOR CITY <br />PROJECT 19‐6, SEWER CAPACITY IMPROVEMENTS <br />DEPARTMENT HEAD’S APPROVAL: Craig Schlichting – Director of Community Assets and <br />Development <br />CITY MANAGER APPROVAL: <br /> <br /> <br />No comments to supplement this report _______ Comments attached ______ <br /> <br />Recommendation: Authorize the Director of Community Assets and Development to enter into a <br />contract with Bolton & Menk, Inc. for professional engineering services and authorize preparation <br />of plans and specifications for City Project 19‐6, Sewer Capacity Improvements. <br /> <br />Legislative History: N/A <br /> <br />Financial Impact: Staff received a November 18, 2019 proposal from Bolton & Menk, Inc. A copy <br />of their proposal is attached to this report. The total estimated fees and expenses for their work <br />tasks are as follows: <br /> <br /> Task 1 – Field Data Collection and Project Documentation $24,470 <br /> Preconstruction/Topographic Surveying <br /> Internal Pipe Inspection <br /> Geotechnical Analysis <br /> Easement Review and Documentation <br /> As‐Built Review <br /> Private Utility Conflict Review <br /> Preliminary Site Visit <br /> Construction Method Analysis and Cost Estimate <br /> <br /> Task 2 – Project Design (Plans and Specifications) $48,810 <br /> Field Data Collection <br /> Private Utility Coordination Meetings <br /> Final Plans and Specifications <br /> Final Engineer’s Estimate <br />AGENDA SECTION: Consent <br />REPORT DATE: November 20, 2019 <br />MEETING DATE: November 26, 2019
The URL can be used to link to this page
Your browser does not support the video tag.