Laserfiche WebLink
  <br />   Task 3 – Project Bidding and Procurement Services        $4,405  <br /> Contractor Procurement  <br />  <br />   Task 4 – Project Communication: Community Outreach and Education  $12,190  <br /> Project Communications  <br /> Project Neighborhood Meetings and Open House  <br /> Digital Communications  <br />  <br />  Total Estimated Fees and Expenses      $89,875   <br />   <br />Explanation:  In January 2019, a capacity analysis of the existing sanitary sewer system was  <br />completed for areas of potential future redevelopment along Old Highway 8 NW and the current  <br />Midtown Village site. This analysis modeled potential future uses and identified specific segments  <br />of existing sanitary sewer main that will no longer be adequately sized during peak flows. As a  <br />result, City Project 19‐6, Sewer Capacity Improvements has been initiated and will include upsizing  <br />and rehabilitating existing sewer mains to support future redevelopment.  <br />The sewer mains requiring upsizing and rehabilitation are located along rear lot lines within  <br />previously platted narrow alley and sewer easements. This condition presents a set of unique  <br />challenges and a complexity related to constructability and space constraints. Due to this, staff  <br />solicited a proposal for the design and implementation of the project. Bolton & Menk, Inc. was  <br />selected due to their expertise and working knowledge in trenchless technology (pipe bursting,  <br />horizontal directional drilling, cured‐in‐place‐pipe) which will likely be used to reduce the impacts  <br />to residents within the project corridor. A copy of the sanitar y sewer analysis and proposed project  <br />area map are attached to this report.  <br />Costs and Funding: This project will be paid for by Fund 560 and reimbursed with TIF dollars from  <br />the Pulte portion of the Midtown Village development.  <br />  <br />  <br />  <br />  <br />________________________________________  <br />Craig Schlichting, P.E.  <br />Director of Community Assets and Development  <br />  <br />Attachments:  <br /> Sanitary Sewer Analysis  <br /> Project Area Map  <br /> Proposal dated November 18, 2019