My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.11.16 CC Packet
NewBrighton
>
Council
>
Packets
>
2019
>
2019.11.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:40:07 AM
Creation date
12/16/2020 3:28:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C:\Users\mitchho\Desktop\New Brighton MN - Sewer Capacity Expansion Proposal.docx <br /> <br />November 18, 2019 <br /> <br />Craig Schlichting - Director of Community Assets and Development <br />City of New Brighton, MN <br />803 Old Highway 8 NW <br />New Brighton, MN 55112 <br /> <br />RE: Professional Services Proposal: New Brighton, MN - Sanitary Sewer Capacity Improvement Project <br /> <br />Dear Mr. Schlichting <br /> <br />We appreciate the opportunity to submit this proposal to the City of New Brighton, MN for professional <br />engineering services related to the design, construction, and project administration of the sanitary sewer <br />related capacity improvements required to support future redevelopment initiatives within the City of <br />New Brighton, MN. <br /> <br />Specific improvements to the sanitary sewer system as part of this project include: <br /> <br />· Pipe bursting the existing 8” sanitary sewer (or horizontal directional drilling of a new 10” <br />sanitary sewer), located from MH 15-071 to MH 15-058, to increase the sanitary sewer pipe <br />diameter to 10” to better accommodate future capacity needs. <br /> <br />· Pipe bursting the existing 10” sanitary sewer (or horizontal directional drilling of a new 12” <br />sanitary sewer), located from MH 15-058 to MH 15-104, to increase the sanitary sewer pipe <br />diameter to 12” to better accommodate future capacity needs. <br /> <br />And if budget allows: <br /> <br />· Sewer rehabilitation of the existing 8” sanitary sewer systems (Located from MH 15-022 to MH <br />15-015 & MH 15-106 to MH 15-016) <br />o Cured-in-place-pipe (CIPP) lining of the existing sanitary sewer pipe systems <br />o Manhole rehabilitation of the existing sanitary sewer manhole structures <br /> <br />The attached scope of work and fee estimate describes our proposal in detail. If you have any questions <br />regarding this proposal, please feel free to contact me at 952-358-1845 or Mitchell.Hoeft@bolton- <br />menk.com. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br /> <br />Mitchell R Hoeft, P.E <br />Project Manager – Trenchless Pipeline Services Group <br /> <br />Cc: Seth Peterson, P.E., Bolton & Menk
The URL can be used to link to this page
Your browser does not support the video tag.