My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.11.16 CC Packet
NewBrighton
>
Council
>
Packets
>
2019
>
2019.11.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:40:07 AM
Creation date
12/16/2020 3:28:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional Services Proposal: New Brighton, MN – Sanitary Sewer Capacity Improvement Project <br /> <br />November 18, 2019 <br /> <br /> <br /> <br />* Fees for each task will be billed using hourly rates with not to exceed totals shown above. <br /> <br />** The fee for task 5 includes an allowance for general construction related needs on the project. If preferred, <br />New Brighton may elect to utilize this and build an allowance into this contract so that they can utilize Bolton <br />& Menk construction services on an as needed basis during construction. <br />ASSUMPTIONS <br />The fee proposal above is based on the following assumptions: <br />1. The scope of work for all project areas will include sanitary sewer capacity improvements in <br />the City of New Brighton as described above. If during the design phase it is determined that <br />additional utility or surface replacements are warranted, and the project scope is modified, a <br />fee adjustment may be required. <br />2. New Brighton, MN to provide any as-builts and project documentation that they have which <br />may benefit the design of this project. <br />3. New Brighton, MN to provide property ownership and easement information for work <br />located in rear yard or ally areas. <br />4. Any permit application fees will be the responsibility of New Brighton, MN. <br />5. The cost for internal closed circuit televised (CCTV) inspection of the sanitary sewer in <br />question shall be contracted and paid for directly by the City. <br />6. The cost for geotechnical analysis shall be contracted and paid for directly by the City. <br />7. Pre-construction photos to be completed by the City prior to construction unless this work is <br />granted to Bolton and Menk via a Task 5 allowance allotment. <br />8. Project related communication will be provided by Bolton and Menk and distributed to the <br />residents by the City of New Brighton, MN. <br />9. This proposal does not include any time needed to acquire additional project related <br />easements. <br />10. Deliverables will include pdf and electronic files. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.