My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.11.16 CC Packet
NewBrighton
>
Council
>
Packets
>
2019
>
2019.11.16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:40:07 AM
Creation date
12/16/2020 3:28:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional Services Proposal: New Brighton, MN – Sanitary Sewer Capacity Improvement Project <br /> <br />November 18, 2019 <br /> <br /> <br /> <br /> <br />Task 5: Project Administration Construction Support ALLOWANCE <br />It is anticipated that a majority of the tasks involved with general project observation, inspection, and <br />quantity tabulation will be handled by City staff during construction. <br /> <br />Bolton and Menk is available to assist the City with any tasks needed to oversee and administer the <br />construction related activities on the site including but not limited to providing general plan and <br />specification related assistance, pre-construction photos, general construction observation and inspection, <br />construction surveying and staking, project record drawings and close-out, and plan modification and <br />professional engineering support. <br /> <br />The table below shows hourly rates for individuals who may be requested to provide assistance with the <br />construction portion of this project. <br /> <br /> <br /> <br />Although not totaled/included in the professional service fees below, the City of New Brighton may elect <br />to consider adding a construction services allowance ($10,000-$20,000) to this contract which will <br />provide a budget for utilizing additional engineering related services, on an as needed basis, during <br />construction. <br />FEES <br />We propose to provide the professional engineering services needed to complete the project described <br />above broken down into the following tasks as not to exceed totals. <br /> <br /> <br />Personal $/HR <br />Project Manager - Trenchless Group $170 <br />Resident Project Representative $125 <br />Survey Crew $150 <br />Project Administration $90 <br />Bolton & Menk - Hourly Fee Schedule <br />Task 1: Field Data Collection & Project Documentation $ 24,470 <br />Task 2: Project Design (Plans & Specifications) $ 48,810 <br />Task 3: Project Bidding and Procurement Services $ 4,405 <br />Task 4: Project Communication: Community Outreach and Education $ 12,190 <br />TOTAL ESTIMATED ENGINEERING COSTS $ 89,875 <br />Task 5: Project Administration Support $$ ALLOWANCE $$ <br />Bolton & Menk - Proposed Fees (By Task)
The URL can be used to link to this page
Your browser does not support the video tag.