My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.07.03 EDC Packet
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2019
>
2019.07.03 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:07:35 PM
Creation date
1/25/2021 3:43:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Page 3 <br />October 13, 2017 <br />Korean Church, 701 8th Ave NW, New Brighton, MN <br />Project: 10-121-17 <br /> <br />C. Results <br /> <br />C.1. Asbestos-Containing Materials <br /> <br />Exterior: Caulking around the exterior of the windows <br /> <br />South Wing: Window glazing located on older windows <br /> <br />Roof: Transite siding is located on a small transition on the roof from the south to the <br />north roof. <br /> <br />South Wing: Thermal system insulation located on elbows and pipe runs. The pipe <br />insulation is on the heating system as well as the water lines behind walls and in chases. <br />The bathrooms have an access for the water chase that has insulation water lines. <br />The heating system insulation is located in the South furnace room and tunnel system. <br />The asbestos insulation runs from the south tunnel system, through the hallway to the <br />North Boiler room. <br /> <br />South Wing: Furnace room, the furnace room is where the access for the tunnel system is <br />located. The thermal pipe insulation located in this room is asbestos containing. <br /> <br />South Wing: Hallways, 9x9 red floor tile <br /> <br />North Wing: The upper level attic has Vermiculite Insulation. Samples have indicated <br />the insulation is not Asbestos Containing. The MPCA recommends treating the <br />vermiculite as asbestos containing material. <br /> <br />North Wing: Upper level attic and behind walls: The heating system ducts are insulated <br />with asbestos containing paper. The access hatch to observe this material is located in the <br />bathroom. It is assumed from visual observations the insulation is located behind plaster <br />walls in the upper level. <br /> <br />North Wing: Lower level hallway: The hallway has the pipe insulation that is asbestos <br />containing running from the Boiler room to the North Wing. <br /> <br />North Wing: The boiler room has insulation located on the boilers and piping that is <br />asbestos containing. <br /> <br />Roof: The roof system will have to be sampled prior to demolition. No sampling was <br />completed under the rubber roof system. Per MN Dept of Health, Asbestos Rules the <br />material has to be assumed to be asbestos containing until tested. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.