My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.08.07 EDC Packet
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2019
>
2019.08.07 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 4:07:35 PM
Creation date
1/25/2021 3:54:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Traffic Impact Study 2 <br />New Brighton Exchange Update <br />2. Existing Conditions <br />a. Corridor Characteristics <br />Old Highway 8 is Ramsey County State Aid Highway 77 and is classified as an A Minor <br />Reliever. The corridor currently provides for four lanes of travel (two in each direction) <br />with a posted 40-mph speed limit south of Highway 96. The speed limit transitions to <br />30-mph south of Northwest Parkway. Old Highway 8 is an undivided road except for <br />between 14th Street and Northwest Parkway where a median is provided. <br />b. Study Intersection Characteristics <br />The study intersections of Old Highway 8/Highway 96 and Old Highway 8/10th Street <br />are under traffic signal control. The study intersections of Old Highway 8/14 th Street, <br />Old Highway 8/Central Park Boulevard and Old Highway 8/Northwest Parkway are <br />under side street stop control with Old Highway 8 operating as free f lowing. Figure 1 <br />below shows the intersection traffic control and lane configurations for the five study <br />intersections. <br /> <br />Figure 1 – Existing Study Intersection Configurations <br />
The URL can be used to link to this page
Your browser does not support the video tag.