My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.05.21 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2019
>
2019.05.21 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 1:56:11 PM
Creation date
2/16/2021 10:33:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
521
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Planned Residential Development <br />Planning Commission Report; 5-21-19 <br /> <br /> <br />Page 14 <br />GENERAL DEVELOPMENT REVIEW <br />Lots and <br />Blocks: <br /> The development site is made up of 8.47 acres to the north of Old Highway 8, and <br />4.07 acres to the south of Old Highway 8 for a total of 12.54 acres. <br /> Two new public streets are proposed: <br />1. An extension of the existing 7th Street NW across 8th Avenue NW into the <br />development site; and <br />2. An extension of the existing 8th Avenue NW to the south of Old Highway 8. <br /> The existing 7th Street NW to the north of the development site must either be <br />renamed and rebuilt as a narrower road, or must be vacated and replaced with green <br />space as part of this development process. Residents along 7th Avenue prefer the <br />vacation option, so that is what staff is recommending at this time (see Streets & <br />Transportation on pg 27) <br /> All internal drives for the proposed townhome development, senior living building, <br />and workforce housing building will be privately owned and maintained. <br /> <br />Access: The main entrance to the development north of Old Highway 8 will be the <br />intersection of 8th Avenue NW and 7th Street NW. Emergency vehicle only entry <br />points will also be constructed at the ends of Road A and Road D out to 8th Avenue <br />NW to ensure emergency vehicle access at all times. Details for the emergency <br />vehicle entry points shall continue to be worked out with staff leading to the final <br />design. <br /> The main entrance to the development south of Old Highway 8 will come off of the <br />new extension of 8th Avenue NW south of the highway. <br /> Public safety has asked for additional information regarding the geometrics of the <br />entry points and internal drives to ensure safe ingress/egress for emergency vehicles. <br />Minor geometric changes, if needed, shall be made to the plans prior to final plan <br />approval. <br /> Each of the multi-family buildings will have one access point into the underground <br />parking for each structure. <br /> <br />Building <br />Locations: <br /> <br /> <br /> <br /> <br /> <br /> Because this is a PRD, setbacks can be determined by the City based on what is best <br />for this land and for adjacent properties. Typical setbacks in the R-3B district are 30 <br />feet from streets and rears, and 10 feet from side lot lines. <br /> Within the Pulte portion of the development, buildings are proposed to be within 10 <br />to 28 feet of perimeter boundary lines. Nothing suggests any of the proposed setback <br />will be a problem in terms of safety. Locations as they relate to proposed heights of <br />the buildings are examined in the next report section on building heights (pg 15).
The URL can be used to link to this page
Your browser does not support the video tag.