Laserfiche WebLink
SUP Amendment and Site Plan Review; Murlowski Properties Inc. <br />Planning Commission Report; 7-16-19 <br /> <br /> <br />Page 3 <br />General Findings <br />Site Data:  Existing Lot Size ≈ 36.72 acres <br /> Existing Uses: Bel Air Excavating Equipment Storage, Aggregate crushing and <br />recycling, yard waste transfer facility, and road salt storage and transfer facility. <br /> Existing Zoning: I-1 <br /> Property Identification Numbers (PID): 17-30-23-42-0005, 17-30-23-41-0013, <br />17-30-23-42-0004, and 17-30-23-42-0006 <br /> <br />Comp Plan <br />Guidance: <br /> The comprehensive plan guides this property for Light Industrial Use. <br /> <br />Notable Code <br />Definitions: <br /> None <br /> <br />Applicable <br />Codes: <br /> Chapter 6, Article 1, I-1 District. <br />Outlines the general rules, allowable uses, and zoning standards for the I-1 zoning <br />district. <br /> Chapter 6, Article 7, Environmental Constraint Overlay Area. <br />Outlines additional overlay district rules applicable to this property as it is within <br />the overlay district. <br /> Chapter 8, Article 2, Special Use Permit and Variance. <br />Identifies the process by which a special use requests are to be reviewed and <br />decided. <br /> <br />Applicant’s <br />Narrative: <br />Murlowski Properties Inc. is proposing to move the existing concrete and asphalt rubble pile from <br />the north of the site approx. 200 feet south. The purpose of the move is to free the already <br />consolidated dirt portion north of the site for a future use. The move will also help further <br />consolidate the southern portion of the landfill in order to achieve future uses. The property will <br />operate no differently than the current operation and will remain in compliance with all current <br />S.U.P conditions. Trucks will still come onto the site dump their load; the loader will push the <br />material into a stockpile for future crushing purposes. The crushed product will mainly be used as <br />class V road base. The operation on site has long been approved and have proceeded per our <br />existing S.U.P. <br /> <br />