My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.07.16 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2019
>
2019.07.16 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 1:56:11 PM
Creation date
2/16/2021 11:50:59 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUP Amendment and Site Plan Review; Murlowski Properties Inc. <br />Planning Commission Report; 7-16-19 <br /> <br /> <br />Page 4 <br />Site Plan Review <br />In General: The site has been successfully operating under its current SUP since 2015 without <br />complaint, so any issues regarding noise that may have once existed have clearly <br />been mitigated thanks to the sound wall and other restrictions placed on the SUP. <br /> <br />Building <br />Materials: <br /> Not applicable: the SUP amendment does not propose new buildings. <br /> <br />Building <br />Height: <br /> Not applicable: the SUP amendment does not propose new buildings. <br /> <br />Floor Area <br />Ratio: <br /> Not applicable: the SUP amendment does not propose new buildings. <br /> <br />Landscaping: Not applicable: the SUP amendment does not trigger any new landscaping <br />requirements. <br /> <br />Lot Access: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> The applicants are not proposing any change to lot access at this time. However, <br />they have expressed interest in eventually coming forward with an application to <br />re-plat the entirety of the grounds to clean up a number of title issues. In doing so, <br />they plan to concurrently seek approval of a new ingress/egress roadway to the <br />north of the existing railroad tracks out to Old Hwy 8. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.