My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.08.20 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2019
>
2019.08.20 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 1:56:11 PM
Creation date
2/16/2021 12:03:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUP Review: Big Blue Box <br />Planning Commission Report; 8-20-19 <br /> <br /> <br />Page 8 <br />(cont.) 5. That the special use shall in all other respects conform to the applicable <br />regulations of the district in which it is located. <br />Staff Comment: The plans as drawn up appear to meet all other requirements of <br />the I-2 zoning district. Criteria met. <br /> <br />Additional <br />Information: <br /> None <br /> <br />Engineering <br />Review: <br /> No issues were identified by engineering warranting a review memo; however, the <br />applicant should be required to address stormwater concerns if unforeseen issues <br />arise (or become foreseeable) as a result of on-site storage or proposed changes to <br />the storage configuration. <br /> <br />Public <br />Comment: <br /> Staff has not received any feedback from surrounding property owners as of 8/13/18. <br /> <br /> <br />Conclusion: <br /> The application is requesting approval of a special use permit to authorize a moving <br />storage container & cargo container business that rents, sells and stores new and <br />used portable storage containers from the property at 401 1st Street SW. <br />Staff Recommendation: Per the analysis outlined in the report, staff is <br />recommending APPROVAL of the proposed site plan with conditions. <br /> <br />Commission <br />Options: <br />The Planning Commission has the following options: <br />A) RECOMMEND APPROVAL OF THE REQUEST based on the <br />applicant’s submittals and findings of fact. <br />B) RECOMMEND DENIAL OF THE REQUEST based on the applicant’s <br />submittals and findings of fact. <br />C) TABLE THE ITEM and request additional information. <br />Based on an application date of 7/19/19, the 60-day review period for this <br />application expires on 9/17/2019. This deadline can be extended an additional 60 <br />days if more time is necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.