My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.11.19 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2019
>
2019.11.19 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 1:56:12 PM
Creation date
2/16/2021 1:15:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flagman will likely be required for any work within RR ROW. Connection to Dominium property is <br />not shown, is this intentional? More detail for path below RR bridge is required. <br /> <br />3. Provide detailed layout with spot elevations at ped ramp locations. <br /> <br />4. Provide barricades and signage at end of 8th Avenue extension. <br /> <br />5. Signal location (best guess from Kimley Horn Plans) needs to be shown, adjust other facilities as <br />required (possibly monument). <br /> <br />6. Show new salt building and fuel pumps on plans. Your contractor shall demo the existing facility, <br />grade the site to accommodate the new utilities, and pave the disturbed areas. We will install the <br />new salt building and fuel pumps. <br /> <br />7. BKV plans do not clearly show PW fence, please indicate location on plans. <br /> <br />8. Show Magellan updates based on survey and new wall/utility locations. <br /> <br />C 3-1 <br /> <br />1. Fence on wall at senior is shown on detail, but should be noted on plans. <br /> <br />2. Structural design on gravity wall or tie backs needs to be provided. <br /> <br />3. Fence on family wall is shown in details, but should be noted on plans. <br /> <br />4. Wall tie-backs into RR bridge area needs more detail (riprap, or concrete slope paving may be <br />required). <br /> <br />C 3-2 <br /> <br />1. Provide additional inlet protection to catch basins mid-block 7th Ave NW. <br /> <br />2. Move rock construction entrance for senior building site east to actual entrance to site. <br /> <br />3. Install erosion control blanket along entire slope between family building parking lot and public <br />works lot. <br /> <br />C 3-5 <br /> <br />1. Coordinate trail location with Minnesota Commercial Railway. Trail may need to be shifted to <br />provide clear zone. <br /> <br />2. Label contours and show drainage pattern adjacent to trail. <br /> <br />3. Detail plan required for path under RR bridge. <br /> <br />4. Flagman to be provided by RR for work within ROW. <br /> <br />5. Trail to cross RR with switch back fence, coordinate with engineering. <br /> <br />C 4-1 <br /> <br />1. Show watermain and sanitary sewer mains through Pulte site. Call out locations where <br />connections are made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.