My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019.11.19 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2019
>
2019.11.19 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 1:56:12 PM
Creation date
2/16/2021 1:15:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />interoffice <br />MEMORANDUM <br /> <br /> <br /> <br />to: Ben Gozola, Assistant Director of Community Assets and Development/City Planner <br />from: Craig Schlichting, Director of Community Assets and Development <br />subject: Midtown Village <br />date: November 15, 2019 <br /> <br />The Engineering Department has reviewed the revised the site plan dated 8/20/2019 for Midtown Village <br />and we offer the following comments: <br /> <br />C 1-2 <br /> <br />1. Coordinate removals and sewer/water connections on 7th Avenue NW and 7th Street NW with <br />Pulte. <br /> <br />2. The 15” RCP storm sewer located in SE corner of Senior Building property shall be removed or <br />plugged on both ends and abandoned in place. <br /> <br />3. Watermain located between the senior building easterly property line and 6th Avenue NW shall be <br />abandoned in place. A new water service to 690 6th Ave NW shall be provided from watermain <br />located in 6th Ave NW. See attached water map. City may expedite this service connection and <br />bill dominium accordingly to avoid stagnant water in domestic service. <br /> <br />4. Update Demo plans to show PW site changes with new salt building. <br /> <br />5. Fiber re-route must be kept within ROW and easements, not placed on Dominium property. <br /> <br />6. Fence/tree/sewer service removal and replacement to be coordinated with home owner at 751 7 th <br />Avenue. <br /> <br />C 2-1 <br /> <br />1. Proposed roadway width of 8th Avenue extension should be 26’ face to face. <br /> <br />2. Installation of a fence will be required between the proposed bituminous path and railroad tracks. <br />Minnesota Commercial and property owner to review plans and provide comments. Permit aand
The URL can be used to link to this page
Your browser does not support the video tag.