Laserfiche WebLink
Midtown Village August 20, 2019 <br />Response to City of New Brighton Comments <br /> <br />Prepared by Loucks 4 of 5 <br /> <br />Sheet 4-1 <br /> <br />1. No PVC for water to be owned and maintained by City. Services or private main can <br />remain PVC. <br /> Response: Materials updated on plan sheets and in notes. <br /> <br />2. Move hydrants to location best suited for fire protection and shown building fire <br />department connection locations. <br />Response: Please provide fire department review if new hydrant locations are needed. <br /> <br />3. Water east of Senior Building to be abandoned and filled with sand. New Service to be <br />installed for affected resident(s). <br />Response: Watermain is shown to be removed to property line and plugged. <br /> <br />4. Show Magellan facilities. <br />Response: Surveyors do not have access to gated Magellan facility. <br /> <br />5. Replace 90-degree bends with 45-degree bends. Water cannot be placed within Magellan <br />easement. <br />Response: All 90-degree bends have been replaced with two 45-degree bends. <br /> <br />6. Show newly re-installed hydrant on City PW facility site. <br /> Response: New hydrant added on PW property. <br /> <br />Sheet 4-2 <br /> <br />1. Show easements for watermain that is not private. <br />Response: Easements added for public watermain. <br /> <br />2. Show valves for family building services <br />Response: Domestic water service connections shown having gate valves at both the <br />family and senior buildings. No valves are to be installed on fire protection services. <br /> <br />3. RCP for storm on City PW site. <br /> Response: Materials updated in plan notes. <br /> <br />4. Storm sewer cannot be located in Magellan easement. <br />Response: Storm sewer has been routed around north and west sides of building to avoid <br />Magellan easement. <br /> <br />5. Storm sewer on lot line near Pulte units will need an easement. <br />Response: Plat covers this area with necessary easement. <br /> <br />6. All proposed storm and sanitary structures shall have flex seal installed on the adjusting <br />rings. <br /> Response: Note added to utility sheets. <br /> <br />Sheet 8-1