My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020.04.21 Planning Commission
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2020
>
2020.04.21 Planning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:57:35 AM
Creation date
2/16/2021 2:21:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Murlowski Industrial Park SUP Amendment, Site Plan Amendment, and Variance <br />Planning Commission Report; 4-13-20 <br /> <br /> <br />Page 4 <br />(cont.) <br /> <br />The clients are requesting a 2 lot final plat. Lot 1 would consist of the existing building owned by Murco Inc. <br />The boundary of Lot 1 will not differ from the current property description for that lot. Lot 2 would consist of <br />and combine the remnant parcels. <br />As part of this application we are requesting the City of New Brighton waive certain requirements until a final <br />development plan is prepared. Once this phase of the project is complete and the legal descriptions and title <br />is cleaned up we will address final easements, wetland, storm water, engineering, dedication, and other <br />issues as part of a final development plans. <br /> <br /> <br />Site Plan Review <br />In General: No changes to existing uses are contemplated with this application. In reviewing <br />the existing uses, we find that the site has been successfully operating under its <br />current SUP since 2015 without complaint. <br /> Approval of the latest SUP amendment in 2015 included a condition (#7) which <br />placed a “natural conditions” restriction on the chimney portion of the property. <br />This SUP and Site Plan amendment review is necessary to remove that restriction, <br />and to allow for the platting of a new Outlot that could accommodate a future <br />public or private roadway if needed to support future development. <br /> <br />Building <br />Materials: <br /> Not applicable: the SUP amendment does not propose new buildings. <br /> <br />Building <br />Height: <br /> Not applicable: the SUP amendment does not propose new buildings. <br /> <br />Floor Area <br />Ratio: <br /> Not applicable: the SUP amendment does not propose new buildings. <br /> <br />Landscaping: Not applicable: the SUP amendment does not trigger any new landscaping <br />requirements. <br /> <br />Lot Access: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> As indicated in the 7-16-19 staff report, the applicants are interested in establishing <br />a possible roadway route through the chimney of the property to address future <br />access issues. No objections to that possibility were raised at that time, and the <br />applicant’s are now pursuing that option. <br />
The URL can be used to link to this page
Your browser does not support the video tag.