Laserfiche WebLink
<br />2. Install gate valve on domestic water service. <br /> <br />3. Note that all hydrants shall be Clow Medallion. <br /> <br />4. Show location of Fire Department Connection. <br /> <br />5. Tracer wire to be provided on PVC watermain, coordinate approved materials with Public Works. <br /> <br />6. Storm sewer MH at 7th Avenue to be replaced with appropriate sized precast. Update demolition <br />plan to include impacts to curb and bituminous at new 7th Avenue hammerhead. <br /> <br />7. Sewer service for 751 7th Avenue to be cut and routed to MH north on 7th Avenue. <br /> <br />8. Storm sewer that runs beneath the 7th Avenue hammerhead shall be RCP. <br /> <br />C 4-2 <br /> <br />1. Coordinate connection at existing catch basin on 7th Street NW with Pulte. Ensure structure is <br />large enough to accept additional 24” pipe. <br /> <br />2. Provide maintenance schedule for underground storm sewer system. <br /> <br />3. Call out elevations where watermain and storm sewer cross to prevent conflicts. <br /> <br /> <br /> Miscellaneous <br /> <br />1. MnDOLI permit to be acquired. <br /> <br />2. Obtain fire apparatus dimensions for turning movements. <br /> <br />3. Concrete sidewalk within City ROW to have 6” aggregate base. <br /> <br />4. Show truncated domes at all pedestrian ramp locations. <br /> <br />5. Look into possibility of relocated power pole along Old Highway 8 and illuminate sidewalk jog. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />