Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />interoffice <br />MEMORANDUM <br /> <br /> <br /> <br />to: Ben Gozola, Assistant Director of Community Assets and Development/City Planner <br />from: Craig Schlichting, Director of Community Assets and Development <br />subject: Oaks Landing Apartments <br />date: May 15, 2020 <br /> <br />The Engineering Department has reviewed the revised site plan dated 3/26/2019 for Oaks Landing <br />Apartments and we offer the following comments: <br /> <br />C 1-1 <br /> <br />1. Existing conditions of 7th Avenue, 7th Street, and 8th Avenue have changed as a result of Midtown <br />Village construction. Update sheet to reflect current conditions. <br /> <br />C 1-2 <br /> <br />1. Update sheet to include current conditions of 7th Avenue, 7 Street, and 8th Avenue. Sewer and <br />water connections in 7th Street and 7th Avenue have been completed by Pulte. <br /> <br />C 1-3 <br /> <br />1. Contractor to provide additional traffic control for offsite work. Work shall also be coordinated with <br />affected homeowner(s). New service installation will be coordinated and installed by City and <br />billed to Dominium. <br /> <br />C 3-1 <br /> <br />1. Structural design on gravity wall or tie backs needs to be provided. <br /> <br />2. Wall tie-backs into RR bridge area needs more detail (riprap, or concrete slope paving may be <br />required). <br /> <br />C 4-1 <br /> <br />1. Remove hydrant adjacent to 7th Ave hammerhead. This was not installed.